After partnering with Kaleris to accelerate their yard operations, Bob Evans Farms reduced their loaded…
After partnering with Kaleris to accelerate their yard operations, Bob Evans Farms reduced their loaded reefer hours by nearly 40% — that’s 134,000 hours.
“Really, the hard savings for us was easy and included the reduction in trailers, fewer…
“Really, the hard savings for us was easy and included the reduction in trailers, fewer yard drivers, reduction of fuel consumption, and the elimination of cell phones.”